Cookies

Cookie settings

Choose which optional cookies you accept. Your choice is saved in this browser for 12 months, and you can change it at any time with Cookie settings at the bottom of every page.

  • Necessary

    Always on

    They keep the website working and remember your cookie choice. The law does not require your consent for them.

  • Analytics

    They would help us understand how the website is used, so that we can improve it. We do not use any analytics tools today.

  • Marketing

    They would let us measure and show our own advertising. We do not use any marketing tools today.

The booking window is run by Calendly, which asks about its own optional cookies when you open it. More about cookies in our Privacy Policy.

Language

Kitchens · Costa del Sol

Arrange a visit

Kitchen Redesign

Your units stay.
Everything you see changes.

We take off the fronts and the side panels, and fit new ones onto the units you already have. Three to five days, and no building work.

Arrange a visit
Kitchen fronts and lighting fitted by Next Level

What a redesign is

What actually gets replaced?

A kitchen is a run of units with doors and drawer fronts fixed to them. The units are the part nobody sees, and the part that rarely wears out. The fronts are the part you look at and touch every day, and the part we replace.

What we replace

  • Fronts and doors
  • Side panels
  • Plinths
  • Lighting
  • Handles and hardware

What stays

  • The units
  • The layout
  • The plumbing
  • The worktop, when it is sound

Most of these kitchens have a stone worktop, and the best result usually comes from keeping it and choosing the new fronts to sit with it. We also fit new worktops.

Will it work on your kitchen?

One thing decides it.

The structure. The units that carry the fronts have to be sound. That is the whole test, and it takes a few minutes at the visit: we open them, we look at them, and we tell you there and then.

If one unit has given out, and after years of damp it is usually the one under the sink, we replace that unit and carry on with the rest.

The days

What happens in your home.

  1. Day one

    We take the old kitchen off

    Fronts, doors and side panels come off, and the old ones leave with us.

  2. Day two

    The new fronts start going on

    Doors, drawer fronts and side panels go on where the old ones were.

Day three onwards

The same, until it is done

Lighting, handles and the finishing pieces go in, and the kitchen is back.

About the dust

There is no building dust, because there is no building work. The only cutting we do in your home is trimming a finishing piece to fit.

What we need from you

Before day one, the units need to be empty, and the cupboards reasonably clean inside.

The price

One number, in writing, and it holds.

We price a kitchen after seeing it, never before. The visit is at no charge. Within 48 hours you have one closed price by email, built on the materials you choose and nothing else.

If we find something at the visit that changes the work, you hear it then, not afterwards.

Starting from scratch

Some kitchens need a full rebuild.

A new layout, new plumbing, new units. That is a different project, and we build those too.

See new kitchens

Let us look at your kitchen.

We’ll tell you at the visit whether it works, and send a closed price within 48 hours.

Arrange a visit

design@nextlevelcocinas.com +34 647 036 816